Cheyenne Panzeter
Sep 2026
The craftsmanship was excellent, the project stayed on schedule, and the team always cleaned up after themselves.
Kitchen and deck

Pitman, NJ · South Jersey
| Project | What counts | Median spend | Top 10% spent |
|---|---|---|---|
| Major kitchen remodel, under 200 sq ft | At least all cabinets and appliances replaced | $35,000 | $93,000 or more |
| Major kitchen remodel, 200 sq ft or more | At least all cabinets and appliances replaced | $55,000 | $150,000 or more |
Source: Houzz, 2026 U.S. Houzz & Home Study. U.S. homeowners' spend on projects in 2025, done themselves or with professionals, not adjusted for inflation. Figures checked September 2026. Kubat prices each project after a free walkthrough.
In the Middle Atlantic region, a midrange minor kitchen remodel cost about $31,212 and recouped 107.2% of that at resale and a midrange major kitchen remodel cost about $89,679 and recouped 49% of that at resale, according to the Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com).© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com.
The pattern is worth knowing: a smaller, well-chosen update recoups more of its cost at sale than a full remodel does. A full remodel is about how you use the kitchen every day. The full breakdown, with how home age changes the picture across South Jersey towns, is in the kitchen remodel cost guide.
Stock, semi-custom or fully custom cabinets, with quartz, granite, quartzite or natural stone tops templated from the installed cabinets.
Opening walls, moving the sink or range, and adding an island, with the structural and mechanical work that comes with them.
Recessed, under-cabinet and pendant lighting, new circuits for appliances, and induction or electric ranges that need their own circuit.
Sink and dishwasher lines, gas for a range, and a range hood sized for the cooktop and vented to the outdoors.
Tile, hardwood or resilient flooring, and a tile or slab backsplash.
Planned into the cabinet design from the start, because cabinet sizes depend on appliance specifications.
What renovating homeowners are choosing right now, from a national survey: wood cabinets have overtaken white (29% to 28%), Shaker doors lead at 58%, and induction is at 26% of new cooktops. More in kitchen trends for 2026.
Many kitchens around here sit in older houses: in Pitman, the median home was built in 1945 (U.S. Census Bureau). Behind the cabinets of a house that age there can be old supply lines, cast-iron drains, older wiring and walls that are rarely square, so the walkthrough looks behind the finishes before anything is designed. In a home built before 1978, paid work that disturbs paint follows the EPA's lead-safe rules.
A kitchen that keeps its layout can be mostly ordinary maintenance: cabinets, flooring, trim, a like-for-like light fixture, a new dishwasher, and a range hood that exhausts no more than the old one or 400 cubic feet per minute (N.J.A.C. 5:23-2.7). Moving the sink, gas or wiring, or cutting a load-bearing wall, needs a construction permit (N.J.A.C. 5:23-2.14). More: when a New Jersey remodel needs a permit.
Timelines vary with the scope, the house and how long selections and permits take. For a national benchmark, kitchen projects averaged 9.5 months of planning and 5.8 months of construction among U.S. homeowners who renovated in 2025, according to the 2026 U.S. Houzz & Home Study. Those averages include do-it-yourself work. Planning taking longer than building is normal, and it is where a project's budget is won or lost. Whatever the length, New Jersey requires a home improvement contract to state the dates or time period for starting and finishing the work (N.J.A.C. 13:45A-16.2).
The step-by-step version is in how to plan a kitchen remodel. Ready to start? Request an estimate or call (856) 214-9156.
© 2025 Zonda Media, a Delaware Corporation. Complete data from the Remodeling 2025 Cost vs. Value Report can be downloaded free at www.costvsvalue.com.
26 reviews on Google
Cheyenne Panzeter
Sep 2026
The craftsmanship was excellent, the project stayed on schedule, and the team always cleaned up after themselves.
Kitchen and deck
Sean Powell
Aug 2026
They are professional, reliable, hardworking, and truly take pride in the quality of their work.
John Gendron
Jul 2026
At the end of every workday they cleaned up inside and outside… Kubat construction truly exceeded all of our expectations!
First floor renovation
Rachael
Jun 2026
They texted us every day throughout the process with photos and updates… This is exactly who you want for your remodel.
Bathroom remodel
Kyle and Emily Gillam
Mar 2026
They work fast and are always courteous while working in your home. We absolutely love our new bathroom and office addition!
Bathroom and office addition
Jeremiah Lin
Jan 2026
Our previously dark, cold unfinished basement is now a brighter, more inviting area… Quality of work was solid as well.
Basement finishing
Matt Fleekop
Dec 2025
Every morning for 4 weeks, Brian showed up at 8am… Our bathroom came out amazing. Every detail was accounted for.
Bathroom remodel
Del Doran
May 2025
Our counter space like quadrupled. Also our cabinet storage space is so much more that we are having trouble filling all the cabinets.
Kitchen remodel
Questions
Nationally, a major kitchen remodel had a median cost of $35,000 for kitchens under 200 square feet and $55,000 for larger ones in 2025 (2026 U.S. Houzz & Home Study). For the Middle Atlantic region, a midrange minor kitchen remodel cost about $31,212 and a midrange major kitchen remodel about $89,679, according to the Remodeling 2025 Cost vs. Value Report (www.costvsvalue.com). We price your kitchen after a free walkthrough.
It varies with scope, the house and how long selections and permits take. As a national benchmark, kitchen projects averaged 9.5 months of planning and 5.8 months of construction in 2025 (2026 U.S. Houzz & Home Study), including do-it-yourself work. Whatever the length, New Jersey requires the contract to state when the work will begin and be completed (N.J.A.C. 13:45A-16.2).
It depends on the work. New cabinets, countertops and flooring are ordinary maintenance with no permit (N.J.A.C. 5:23-2.7). Moving the sink, running or moving a gas line, adding circuits or cutting a load-bearing wall needs a construction permit (N.J.A.C. 5:23-2.14), and the contractor may not start that work until it is issued (N.J.A.C. 13:45A-16.2).
Usually. If the wall carries load, it comes out with a beam in its place, and anything running through it (ducts, pipes, wiring) is rerouted. Cutting a load-bearing wall is never ordinary maintenance, so it always needs a permit (N.J.A.C. 5:23-2.7).
We handle the design: measurements, layout options, finish selection and a virtual rendering you see before construction starts. That is the point of design-build: one company is responsible from the first drawing to the final walkthrough.
Not once demolition starts. Most households set up a temporary kitchen in another room with the refrigerator, a microwave and a coffee maker, and plan meals around the gap between cabinet installation and countertops, which are measured from the installed cabinets.
Office hours: Mon to Fri, 8:00 AM to 5:30 PM.